HD Custom Dirt & Drainage
HD Custom Dirt & Drainage
  • Home
  • Gallery
  • Videos
  • About
  • FAQ
  • More
    • Home
    • Gallery
    • Videos
    • About
    • FAQ
  • Home
  • Gallery
  • Videos
  • About
  • FAQ

Watch Us in Motion

Auger Drilling

Each post hole is drilled to specific depth measurements and spacing between each post.  This ensures equalized tension on wall tie-backs for support. 

Measuring Wall Tie-Back Systems

We triple measure each wall tie-back to assure wall intergrity.

Installation of Wall Tie-Backs

Wall Tie-Backs to treated posts are set 1-2' underground with 4000psi concrete with a spacing of 8-10' in distance.  

Copyright © 2023 HD Custom Dirt & Drainage - All Rights Reserved.

  • Home
  • Gallery
  • Videos
  • About
  • FAQ

Powered by GoDaddy

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept